WATER TREATMENT INSTALLATION FOR A METALLURGICAL PLANT

CONSUMERS

Process water for the converter workshop 300.0 m3/hour 

Process water for the blast furnace workshop 15.0 m3/hour 

Feed water for a waste heat boiler 70 m3/hour 

EQUIPMENT

Two-stage reverse osmosis 4 х 100,0 m3/hour 

COMPLETED WORKS

The range of services included the design of the P and WP stages, production and supply of equipment, reconstruction of existing equipment, complete replacement of the software, installation and commissioning. 

TECHNOLOGY DESCRIPTION

Under this project we carried out a deep reconstruction of the two-stage reverse osmosis installation with replacing the hydraulic part of the installation, membrane elements, instrumentation, software and SCADA-based visualization.